| Subject: In February 2010, Aker Wirth delivered a TBM to Switzerland Sun Mar 27, 2011 4:49 pm | |
| In February 2010, Aker Wirth delivered a TBM to Switzerland, for the expansion of Linth Limmern Power Plant in Switzerland. The borehole has a diameter of 8.03 metres (26.3 ft).[2] The TBM used for digging the 57-kilometre (35 mi) Gotthard Base Tunnel, in Switzerland, has a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene Hart) as part of the HSL-Zuid in the Netherlands, with a diameter of 14.87 metres (48.8 ft).[3] This in turn was superseded by the Madrid M30 ringroad, Spain, and the Chong Ming tunnels in Shanghai, China. All of these machines were built at least partly by Herrenknecht. Trofeos escultura de Golfjiletli tel | |
|