In February 2010, Aker Wirth delivered a TBM to Switzerland, for the expansion of Linth Limmern Power Plant in Switzerland. The borehole has a diameter of 8.03 metres (26.3 ft).[2] The TBM used for digging the 57-kilometre (35 mi) Gotthard Base Tunnel, in Switzerland, has a diameter of about 9 metres (30 ft). A larger TBM was built to bore the Green Heart Tunnel (Dutch: Tunnel Groene Hart) as part of the HSL-Zuid in the Netherlands, with a diameter of 14.87 metres (48.8 ft).[3] This in turn was superseded by the Madrid M30 ringroad, Spain, and the Chong Ming tunnels in Shanghai, China. All of these machines were built at least partly by Herrenknecht.

Trofeos escultura de Golf
jiletli tel
Back to top Go down
 
In February 2010, Aker Wirth delivered a TBM to Switzerland
Back to top 
Page 1 of 1
 Similar topics
-
» Near the beginning of the Cold War, on February 9, 1950
» A crash in February 1927, caused by blade root failure,
» There are 12 universities in Switzerland,
» Electricity generated in Switzerland is 56% from
» Education in Switzerland is very diverse because

Permissions in this forum:You cannot reply to topics in this forum
 :: Community Discussion :: Gaming Chat-
Jump to: