jancancook
Posts : 1136 Join date : 2011-01-02
| Subject: A tunnel project must start with a comprehensive investigation of ground Sun Mar 27, 2011 4:48 pm | |
| A tunnel project must start with a comprehensive investigation of ground conditions by collecting samples from boreholes and by other geophysical techniques. An informed choice can then be made of machinery and methods for excavation and ground support, which will reduce the risk of encountering unforeseen ground conditions. In planning the route the horizontal and vertical alignments will make use of the best ground and water conditions. In some cases conventional desk and site studies yield insufficient information to assess such factors as the blocky nature of rocks, the exact location of fault zones, or the stand-up times of softer ground. This may be a particular concern in large diameter tunnels. To give more information a pilot tunnel, or drift, may be driven ahead of the main drive. This smaller diameter tunnel will be easier to support should unexpected conditions be met, and will be incorporated in the final tunnel. Alternatively, horizontal boreholes may sometimes be drilled ahead of the advancing tunnel face. jiletli telTrofeos escultura de Golf | |
|